Stage 1 Activities

(Difference between revisions)
Jump to: navigation, search
(Part B: Due Apr 4th: Drop Blogging activity)
Line 17: Line 17:
 
#* Introductions
 
#* Introductions
 
#* Discussion of HFOSS projects
 
#* Discussion of HFOSS projects
<!--
 
#** Monday, July 27 -- [http://meetbot.fedoraproject.org/foss2serve/2015-07-27/foss2serve.2015-07-27-14.01.log.html Log]
 
#** Monday, July 27 -- [http://meetbot.fedoraproject.org/foss2serve/2015-07-27/foss2serve.2015-07-27-14.01.html Minutes]
 
#** Tuesday, July 28 -- [http://meetbot.fedoraproject.org/foss2serve/2015-07-29/foss2serve.2015-07-29-01.02.log.html Log]
 
#** Tuesday, July 28 -- [http://meetbot.fedoraproject.org/foss2serve/2015-07-29/foss2serve.2015-07-29-01.02.html Minutes]
 
#** Thursday, July 30 -- [http://meetbot.fedoraproject.org/foss2serve/2015-07-30/foss2serve.2015-07-30-18.01.log.html Log]
 
#** Thursday, July 30 -- [http://meetbot.fedoraproject.org/foss2serve/2015-07-30/foss2serve.2015-07-30-18.01.html Minutes]
 
-->
 
 
# '''[[Project Anatomy Activity|Anatomy of a FOSS Project]]''' - 60 minutes
 
# '''[[Project Anatomy Activity|Anatomy of a FOSS Project]]''' - 60 minutes
 
#* A walk through of the major tools and interactions found in a FOSS project.
 
#* A walk through of the major tools and interactions found in a FOSS project.
Line 36: Line 28:
 
#* Pared down evaluation of HFOSS project based on the evaluation metric.
 
#* Pared down evaluation of HFOSS project based on the evaluation metric.
 
#* The results of this will be discussed during the third IRC meeting and also used during stage 2
 
#* The results of this will be discussed during the third IRC meeting and also used during stage 2
# '''[[FOSS In Courses Activity|FOSS in Courses Planning 1]]''' - 60 minutes, post your selected activity to your wiki page.
+
# '''[[FOSS In Courses 1 (Instructors)]]''' - 60 minutes, post your selected activity to your wiki page.
 
#* The results of this will be used in stage 2
 
#* The results of this will be used in stage 2
 
# '''[[IRC Meeting 2]]''' - 60 minutes - the week of Apr 3rd, day and time to be determined
 
# '''[[IRC Meeting 2]]''' - 60 minutes - the week of Apr 3rd, day and time to be determined
 
# Sign up for Stage 2 groups [[Stage2 Groups|here]]. Sign up for one project-based group and one or two course-based groups.
 
# Sign up for Stage 2 groups [[Stage2 Groups|here]]. Sign up for one project-based group and one or two course-based groups.
<!--
 
#* Monday, Aug 17 -- [http://meetbot.fedoraproject.org/foss2serve/2015-08-18/foss2serve.2015-08-18-00.02.log.html Log]
 
#* Monday, Aug 17 -- [http://meetbot.fedoraproject.org/foss2serve/2015-08-18/foss2serve.2015-08-18-00.02.html Minutes]
 
#* Thursday, Aug 20 -- [http://meetbot.fedoraproject.org/foss2serve/2015-08-20/foss2serve.2015-08-20-16.03.log.html Log]
 
#* Thursday, Aug 20 -- [http://meetbot.fedoraproject.org/foss2serve/2015-08-20/foss2serve.2015-08-20-16.03.html Minutes]
 
#* Friday, Aug 21 -- [http://meetbot.fedoraproject.org/foss2serve/2015-08-21/foss2serve.2015-08-21-14.00.log.html Log]
 
#* Friday, Aug 21 -- [http://meetbot.fedoraproject.org/foss2serve/2015-08-21/foss2serve.2015-08-21-14.00.html Minutes]
 
-->
 
  
 
=== Part C: Due Apr 19th ===
 
=== Part C: Due Apr 19th ===
  
 
'''Approximately 4 hours'''
 
'''Approximately 4 hours'''
<!--
 
#* Tuesday, Sept 1 -- [http://meetbot.fedoraproject.org/foss2serve/2015-09-01/foss2serve.2015-09-01-22.59.log.html Log]
 
#* Tuesday, Sept 1 -- [http://meetbot.fedoraproject.org/foss2serve/2015-09-01/foss2serve.2015-09-01-22.59.html Minutes]
 
#* Wednesday, Sept 2 -- [http://meetbot.fedoraproject.org/foss2serve/2015-09-02/foss2serve.2015-09-02-18.01.log.html Log]
 
#* Wednesday, Sept 2 -- [http://meetbot.fedoraproject.org/foss2serve/2015-09-02/foss2serve.2015-09-02-18.01.html Minutes]
 
#* Thursday, Sept 3 -- [http://meetbot.fedoraproject.org/foss2serve/2015-09-03/foss2serve.2015-09-03-21.01.log.html Log]
 
#* Thursday, Sept 3 -- [http://meetbot.fedoraproject.org/foss2serve/2015-09-03/foss2serve.2015-09-03-21.01.html Minutes]
 
-->
 
 
# '''[[Bug Tracker Activity]]''' - 60 minutes
 
# '''[[Bug Tracker Activity]]''' - 60 minutes
 
# '''[[Git_Activity|Source Code Management/Control Activity]]''' - 60 minutes
 
# '''[[Git_Activity|Source Code Management/Control Activity]]''' - 60 minutes

Revision as of 22:44, 5 February 2017

Below is the schedule for the pre-workshop activities. Participants should finish all activities in a timely fashion in order to be reimbursed for travel expenses to the face-to-face portion of the workshop. Please send all comments to Heidi Ellis (ellis@wne.edu).

Part A: Due Mar 13th

Approximately 5-5.5 hours

The activities in these first two weeks will start to introduce you to the world of FOSS projects, the community of faculty interested in student participation in FOSS projects, and a few of the basic communication tools commonly used in FOSS projects.

  1. Intro to FOSS – 60 minutes
  2. Join TOS - 30 minutes
    • Participants sign up for TOS list and explore the TOS community
  3. Introduction to Wikis - 30-45 minutes
    • Provides an overview of wikis and short exercise in which participants create their own page and post an introduction
  4. Intro to IRC - 60-75 minutes
    • Provides an overview of IRC including features and function and an introduction to the role of IRC in FOSS projects
  5. IRC Meeting 1 - 60 minutes - the week of Mar 13th, day and time to be determined
    • Introductions
    • Discussion of HFOSS projects
  6. Anatomy of a FOSS Project - 60 minutes
    • A walk through of the major tools and interactions found in a FOSS project.

Part B: Due Apr 4th

Approximately 5-5.5 hours

  1. FOSS Field Trip - 60 minutes
    • The results of this will be discussed during the third IRC meeting
  2. Project Evaluation Activity - 60-90 minutes - Post results to wiki
    • Pared down evaluation of HFOSS project based on the evaluation metric.
    • The results of this will be discussed during the third IRC meeting and also used during stage 2
  3. FOSS In Courses 1 (Instructors) - 60 minutes, post your selected activity to your wiki page.
    • The results of this will be used in stage 2
  4. IRC Meeting 2 - 60 minutes - the week of Apr 3rd, day and time to be determined
  5. Sign up for Stage 2 groups here. Sign up for one project-based group and one or two course-based groups.

Part C: Due Apr 19th

Approximately 4 hours

  1. Bug Tracker Activity - 60 minutes
  2. Source Code Management/Control Activity - 60 minutes
  3. FOSS in Courses Planning 2 - 60-90 minutes, post your selected activity to your wiki page.
    • The results of this will be used in stage 2
  4. IRC Meeting 3 - 60 minutes - the week of Apr 17th (day/time to be determined)

Optional: If you have time and are sure of your project:

  1. Download/Install project of your choosing - 60 minutes
    • Go to HFOSS Communities and find your project
      • Follow download/install link for your project
    • Limit your efforts to 60 minutes or so
Personal tools
Namespaces
Variants
Actions
Events
Learning Resources
HFOSS Projects
Evaluation
Navigation
Toolbox